Our
Projects
Three projects, written from the project record: the specification gaps, the approvals, the inspections and the corrections, in the order they happened. Clients and end users are not named where consent has not been given.
Commercial office · Dubai
A feature pendant of handmade glass, and a ceiling that had to be ready long before it
A specification still open on dimensions, a client who would not choose a glass tint from a photograph, and a factory shutdown closing in. Installed and lit.
Read the case study
Community majlis · Hatta
A ten-metre chandelier for a community majlis in Hatta
The specification arrived without the one dimension that mattered, the steel was designed months before the fixture existed, and the drawings and the site disagreed. We said so in writing.
Read the case study
Five-star hotel · Ethiopia
Decorative lighting for a five-star hotel in Ethiopia
A client in Dubai, a factory in Asia, a site in Ethiopia, and bespoke fixtures throughout, with no stage started before the previous one came back signed.
Read the case study